Free accountFree account TV stand plan
Entertainment Center Plans
A full TV wall built from separate boxes: a tower of shelves on each side with doors at the bottom, a low media base between them, and a bridge of open shelves across the top. Each box is small enough to carry and fits standard sheets; screwed together they make one wall unit framing the TV.
- Default size
- 2400 × 2000 × 420 mm
- Parts
- 30 pieces · 12 sizes
- Sheets (2440 × 1220 mm (4 × 8 ft))
- 5 carcass + 1 door + 2 back
- Difficulty
- Intermediate
- Build time
- About 14 hours
- Edge band
- 24.5 m

Cut list (default size)
| Part | Qty | Length | Width | Thick. | Board | Edges |
|---|---|---|---|---|---|---|
| Tower side | 4 | 2000 | 420 | 18 | Carcass board 18 mm | |
| Tower top / bottom | 4 | 420 | 414 | 18 | Carcass board 18 mm | |
| Tower fixed shelf | 2 | 420 | 414 | 18 | Carcass board 18 mm |
Sizes in millimetres; length runs along the grain. Edges: bold lines are banded.
How it is built
- Build four boxes: two towers, the media base and the bridge. Screw them together through the tower sides.
- The base and the bridge get a divider for every 800 mm, so no shelf sags.
- The doors cover the lower part of each tower, up to the height of the base.
- Fix the towers to the wall studs: a tall, loaded unit with a TV is heavy at the top.
Common mistakes
- Sizing the TV opening to the TV exactly: leave about 75 mm all round for air and cables.
- Forgetting cable holes: drill 60 mm holes in the base back and the base dividers before assembly.
Tools you need
- Track saw or table saw
- Drill/driver
- 35 mm hinge bit
- Shelf-pin jig
- Clamps
Frequently asked questions
How big should the TV opening be?
About 150 mm (6 in) wider and taller than the TV: a 65 in TV is about 1440 × 810 mm, so it needs an opening of about 1600 × 960 mm.
How deep should an entertainment center be?
About 400–450 mm (16–18 in) so the media base takes a receiver or a console, and the TV can stand on it if it is not wall-mounted.
Can I build it in parts?
Yes, that is how it is designed: build the two towers, the base and the bridge as separate boxes, then screw them together on site.


